Pilbara Generation Project

Project Overview:

The Pilbara Generation Project (Project) will enhance Fortescue’s existing power generation capacity through the inclusion of 150MW of gas fired reciprocating engine-based power generation, together with 150MW of solar photovoltaic (PV) generation and 50MW of battery storage and will be constructed, owned and operated by Fortescue through its subsidiary Pilbara Energy (Generation) Pty Ltd.

The Pilbara Generation Project complements the Pilbara Transmission Project, which consists of 275km of high voltage transmission lines connecting Fortescue’s existing mine sites.

Together, the Project and the Pilbara Transmission Project, form the Pilbara Energy Connect (PEC) which

·       leverages Fortescue’s existing gas pipeline and latent generation capacity at the Solomon Power Station;

·       will provide Fortescue with a hybrid solar gas energy solution;

·       will enable Fortescue to supply additional power to be delivered to its mine sites; and

·       supports the incorporation of additional large-scale renewable energy in the future.

Scope Overview:

The Pilbara Generation Project will require the:

·       establishment of a Thermal Power Station to connect to the existing Solomon Power station;

·       establishment of Solar PV Generation to generate power and connect to the transmission network; and

·       establishment of a Battery Energy Storage System to connect to the Pilbara Transmission Network.

Indicative Timeline:

Construction activities are expected to commence as follows:

·       Thermal Power Generation is scheduled to commence in August 2020.

·       Battery Energy Storage is scheduled to commence in June 2021.

·       Solar PV Generation is scheduled to commence in April 2021.

Local and Indigenous participation:      

In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for Pilbara Generation Project tendering opportunities.

Go to the project here.

PROJECT HIGHLIGHTS

Vast Solar 1

Vast Solar is developing VS1, a 30 MW Concentrating Solar Power (CSP) plant located in Port Augusta, South Australia.  The CSP plant gathers solar energy during the day, stores it as heat in the molten salt tanks, then when required, uses the stored heat to make steam to drive a turbine to generate electricity.

Forensic Mental Health Expansion Project

This project is led and administered by the Victorian Health Building Authority in collaboration with Forensicare, Victoria’s specialist provider of forensic mental health services. The Project seeks to provide an additional 82 forensic mental health beds on the Thomas Embling Hospital (TEH) site in Fairfield by 2024

Nolans Project

Arafura Resources Ltd is proposing to develop the Nolans Rare Earths project (the Project), which will encompass a mine, beneficiation plant, extraction plant, separation plant, sulphuric acid plant and related non-process infrastructure, to be constructed in the Northern Territory. The project site is located on Aileron Station, approximately 135 kilometres NW of Alice Springs.

gateway arrow image
gateway arrow image

GATEWAY

Use our powerful networking database to find your next project (big and small), or source the best suppliers across Australia and New Zealand.

wedge

STAY INFORMED

Opportunities and insight delivered straight to your inbox. The latest procurement and supply chain news, events and projects in Australia and New Zealand. Just tell us your email address.

ICN HELP DESK

Phone 1300 961 139 (within Australia)
Phone +61 2 6285 2033 (outside Australia)
Email helpdesk@corp-dev.icn.org.au

Connect